X

Foundations for the Olympics – Our Statistics

  • Lee Valley – 12,000 seats, 1067 piles to 8m. (8.5 kilometres of tube installed, uninstalled and recycled)
  • Eton Dorney – 500 seats, 61 piles
  • Hadleigh Farm – 500 seats, 190 piles
  • BMX – 2000 seats, 118 piles
  • Water Polo Venue – The building housed the pool and 5000 seats. 405 piles to average of 8.5m (3.5 kilometres of tube installed, uninstalled and recycled)

Note all sites were installed, uninstalled and recycled.

We provided foundations for 20,000 temporary seats at the Olympics.