ScrewFast have been providing fast, reliable screw pile and steel based foundations on highways and road since 2005, reducing the project duration by up to 70%.

Bicker Fen 400kV Substation

Project Background Our client, Linxon, secured the programme to deliver extension work for the National Grid...

Read Case Study

WHP Telecoms

ScrewFast helical piles installed on five sites in just five days ScrewFast offered client WHP...

Read Case Study

Tokyo 2020 Olympic Games

Following a successful partnership with client ESG to deliver helical piles for the London Olympics...

Read Case Study

Borough Yards, Stoney Street

Wates Group with Keltbray, contracted ScrewFast to install foundations as part of their Borough Yards...

Read Case Study

Ross-on-Wye Substation

Working for client Western Power, ScrewFast carried out the installation of 45 No. Helical Piles...

Read Case Study

Elton Footbridge

ScrewFast’s site team were on site this week and completed the installation of 8 helical...

Read Case Study

Canterbury to Richborough Overhead Lines

ScrewFast were approached by a Murphy Group and Eltel joint venture to design and install...

Read Case Study

North Sea Observatory

Award-winning construction company Gelder Group recruited ScrewFast to design and install foundations to support the...

Read Case Study

Morrison Utility Services – Substations Projects

As part of ScrewFast Foundations long-standing relationship with Morrisons Utilities, we were contracted to install...

Read Case Study

M6 Motorway Junctions 2-4

ScrewFast Foundations were contracted by McCann Ltd to design and install foundations for new Fixed...

Read Case Study

Royal Free Hospital, Hampstead, London

ScrewFast were chosen by main contractors Logan Construction to design, build and install the foundations...

Read Case Study

Chestnut Farm Mobile Dwelling

ScrewFast Foundations were approached by contemporary architects PAD Studio to design foundations for a series...

Read Case Study

East Tilbury Telecommunications Tower Foundations

ScrewFast Foundations were contracted by Galliford Try Communications to design and install foundations for a...

Read Case Study

Chilling King Post Retaining Wall – Environmental

80 Galvanised Posts to 8m installed within 4 days @ 1.5m spacings. 6.5m post embedment,...

Read Case Study

Tesco Stores IOW- Civil Engineering

Dudley’s Construction wanted a cost effective more efficient foundation solution compared to the traditional method...

Read Case Study

Leicester Big Screen- Civil Engineering

ScrewFast were approached by the client to provide a foundation solution for a 9.5m high...

Read Case Study

Henham Footbridge, Latitude Festival- Environmental

The brief was to replace the existing floating bridge with a permanent structure. 12 helical...

Read Case Study

Winster Sub – Energy

13th October 2011 – 10.30am – ScrewFast Commercial Manager receives call from Siemens – Winster...

Read Case Study

Thorpe Marsh- Energy

Brief: Design and Install helical piles solution as a cost effective alternative to concrete. Solution:...

Read Case Study

Clongriffen- rail

Our brief was to design, supply and install 14 OHLE foundations and the 4 Anchors....

Read Case Study

Bletchley Remodeling – rail

The client sought a solution to support 2 Twin Track Cantilever (TTC) Overhead Line Electrification(OLE)...

Read Case Study

Redcar – Flood Defence Wall / Scheme

The Environment Agency awarded a £21M contract to Birse Coastal, a Birse Civils company, to...

Read Case Study