ScrewFast have been providing fast, reliable screw pile and steel based foundations on highways and road since 2005, reducing the project duration by up to 70%.
Case Studies
Henham Footbridge, Latitude Festival- Environmental
Read Case Study
The brief was to replace the existing floating bridge with a permanent structure. 12 helical...
Winster Sub – Energy
Read Case Study
13th October 2011 – 10.30am – ScrewFast Commercial Manager receives call from Siemens – Winster...
Thorpe Marsh- Energy
Read Case Study
Brief: Design and Install helical piles solution as a cost effective alternative to concrete. Solution:...
Clongriffen- rail
Read Case Study
Our brief was to design, supply and install 14 OHLE foundations and the 4 Anchors....
Bletchley Remodeling – rail
Read Case Study
The client sought a solution to support 2 Twin Track Cantilever (TTC) Overhead Line Electrification(OLE)...
Redcar – Flood Defence Wall / Scheme
Read Case Study
The Environment Agency awarded a £21M contract to Birse Coastal, a Birse Civils company, to...