- Our brief was to design, supply and install 14 OHLE foundations and the 4 Anchors.
- The helical piles were designed specifically for the soils encountered at this location.
- The grillages were designed specifically for the OHLE structure and allowed installation close to existing troughing routes and services
- The installation had to be completed within 3 night shifts during 1 weekend.
- 14 grillages and a total of 60 helical piles to a depth of 6m were installed during the 3 night shifts